Download Inhoudsopgave Inhoud Print deze pagina

Front Panel; Rear Panel - HQ Power SEISMO 250 Handleiding

Professioneel 13-kanaals moving head
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 7
d) Description of the device
1. moving head
2. yoke
3. carrying handle
4. base

FRONT PANEL

5. power switch
6. DMX output
7. DMX input
8. power cord
9. fuse holder

REAR PANEL

10. MODE button
11. ENTER button
12. UP button
13. DOWN button
14. display
e) Mounting the Device
• Have the device installed by a qualified person, respecting EN 60598-2-17 and all other applicable norms.
• The carrying construction must be able to support 10 times the weight of the device for 1 hour without deforming.
• The installation must always be secured with a secondary attachment e.g. a safety cable.
• Never stand directly below the device when it is being mounted, removed or serviced. Have a qualified technician
check the device once a year and once before you bring it into service.
• Install the device in a location with few passers-by that is inaccessible to unauthorised persons.
• Overhead mounting requires extensive experience: calculating workload limits, determining the installation
material to be used... Have the material and the device itself checked regularly. Do not attempt to install the
device yourself if you lack these qualifications as improper installation may result in injuries.
• Adjust the desired inclination angle via the mounting bracket and tighten the bracket screws.
• Make sure there is no flammable material within a 0.5m radius of the device.
• Have a qualified electrician carry out the electric connection.
• Connect the device to the mains with the power plug. Do not connect it to a dimming pack.
• The installation has to be approved by an expert before the device is taken into service.
VDP250MHS13
3
HQ POWER

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Vdp250mhs13

Inhoudsopgave