Download Inhoudsopgave Inhoud Print deze pagina

Completing The Installation; Installation Options - Stiebel Eltron HDB-E 12 Si Handleiding Voor Bediening En Installatie

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 44
INSTALLATION
Installation

10.1 Completing the installation

f Fit the lower part of the back panel. Ensure the lower back
panel clicks into place.
f Align the appliance by carrying out the following: Loosen
the fixing toggle and align the power supply and back panel.
Retighten the fixing toggle. If the back panel does not sit
flush against the wall, you can secure the appliance at the
bottom with an additional screw.

10.2 Installation options

- Electrical connection from above on unfinished walls
- large cross-section for power supply from below
- Connecting a load shedding relay
- Water installation on finished walls
- Water installation on finished walls with solder connection/
press-fit fitting
- Water installation on finished walls, fitting the appliance cap
- Installing lower part of back panel
- Use of existing mounting bracket when replacing an
appliance
- Installation with offset tiles
Electrical connection from above on unfinished walls
f Cut open the cable grommet for the power cable.
f Push down the locking hook for securing the mains terminal.
Pull out the mains terminal.
f Reposition the mains terminal in the appliance from the bot-
tom to the top. Secure the mains terminal by sliding it under
the locking hook.
www.stiebel-eltron.com
Large conductor cross-section for electrical connection from
below
If you use cables with a large cross-section, you can fit the cable
grommet after the appliance has been installed.
1.
3.
f Before installing the appliance, use a screwdriver to push out
the cable grommet.
f Slide the cable grommet over the power cable. If the
cross-section is > 6 mm², enlarge the hole in the cable
grommet.
f Push the cable grommet into the back panel. Click the cable
grommet into place.
Connecting a load shedding relay
Install a load shedding relay in the distribution board in conjunc-
tion with other electric appliances, e.g. electric storage heaters.
The relay responds when the instantaneous water heater starts.
Material losses
!
Connect the phase that switches the load shedding relay
to the indicated terminal of the mains terminal in the ap-
pliance (see chapter "Installation / Specification / Wiring
diagrams").
2.
4.
HDB-E Si |
23

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Hdb-e 18 siHdb-e 21 siHdb-e 24 si

Inhoudsopgave