Cargo Floor B.V.
P.O. Box 271
NL-7740 AG COEVORDEN
Phone: +31 (0)524-59 39 00
Fax:
+31 (0)524-59 39 99
Assembly and dismantling instructions for the operation valve
GB
Cargo Floor type CF300 and CF150
•
You have received a operation valve from us to replace a defective one. We request you to
follow the instructions given below exactly in order to enable this replacement to take place as
quickly as possible and without any problems:
•
The total dismantling / installation time for the old / new operation valve shall not exceed 1/2
hours.
Components required
Operation valve
Couplings
Pipeline N
Lever
Bolts / spring washers
•
Tools required:
• Open-ended spanner 32, 36, 17 (for no. 17, 2 units);
• Allen key 8
• Drip tray (bucket);
• Copper grease;
Important information:
-
Guarantee shall only be given with the prior consent of Cargo Floor B.V.!
-
The pump and electrical installation must always be switched-off; in addition, the hoses and/or
pipelines between the pump and the Cargo Floor should also be disconnected.
-
Check the oil level after installation;
-
Check/replace the filter press;
Reparatievoorschriften
Already delivered
1
Reused
Yes
Yes
Yes
Yes
02-03
2003 /