All manuals and user guides at all-guides.com
10. Automatic measurement
The energy cost meter can record the total power consumption of a load for a
certain period of time. The electricity costs and CO
also be displayed on the basis of the data entered for the electricity tariff and
CO
value.
2
Important:
Automatic measurement can only be called and used in "CURRENT"
mode (see Chapter 8. a)
a) Setting the time period
• Briefly press the
and the currently set time period for the meas-
urement process appear on the display.
"00d" = number of days (00 - 07)
"00h" = number of hours (00 - 23)
To cancel the settings and to return to the nor-
mal display, press the
• To start the setting, briefly press the
ton (3), the day flashes.
• Use the
that the measurement process should last.
• Briefly press the
• Use the
that the measurement process should last.
• Briefly press the
flashes on the display.
62
button (4). "PERIOD"
button (2).
button (6) or
(3) button to go to hour setting.
button (6) or
button (3) to end the setting process. No further value
emissions for the period can
2
but-
button (7) to set the number of days (00 - 07)
button (7) to set the number of hours (00 - 23)