Download Inhoudsopgave Inhoud Print deze pagina

Mul Power Op Ons - Gallagher MB1800i Installatie-Instructie

Schrikdraadapparaat
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 24
Step 1. Install the Energizer
Important: Energizer must be installed under cover,
where it is protected from the environment. For
further installa on op ons refer to Mul Power
Op ons below.
Mount the energizer on a wall and out of reach
of children. Install where there is no risk of the
energizer incurring fi re or mechanical damage and
if possible away from heavy electrical equipment
eg. pumps or other items that may cause electrical
interference.
a)
Using the template on the back page, drill 2 x 4mm
(5/32") holes (A & B).
b)
Fix the screws provided into the wall leaving the head
of the screw about 3mm (1/8") out from the wall.
c)
Place the energizer over and slide down onto the
moun ng screws.
d)
Remove orange terminal cover to expose Fence, Earth
and Reference Earth terminals.

Mul Power Op ons

8
Gallagher 3E4347 MB1800i MB2800i Energizer User Manual
Mains
Powered
Battery
Powered
a
b
Solar/ Battery
Powered

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Mb2800i

Inhoudsopgave