Download Inhoudsopgave Inhoud Print deze pagina

SolaX Power X3-Hybrid G4 Installatiehandleiding pagina 70

5 kw; 5.5 kw; 6 kw; 8 kw; 8.3 kw;10 kw; 12kw; 15kw
Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 15
Battery & Quantity
Battery & Quantity
Battery & Quantity
Battery & Quantity
Note:
* For X3-Hybrid-5.5-D LV and X3-Hybrid-8.3-D LV inverters, only 4~12 pieces of battery
modules (TP-HR25/ TP-HR36/ TP-HS25/ TP-HS36) and one piece of TBMS-MCS0800 can
be installed together with an inverter.
HV11550 battery modules have V1 and V2 versions, V1 and V2 with the same number of
inverters, the specific collocation can refer to the relevant part of the battery manual.
3. Battery connection steps
1
Negative battery
pin contact
-
+
Positive battery
pin contact
2
Spring
3
4
* Note: It is recommended that the BMS communication cables and battery power cables
between the inverter and the battery be no more than 3 meters.
66
Battery Control
TBMS-MCR0800 (1 pc)
TBMS-MCR0800 (1 pc)
TBMS-MCS0800 (1 pc)
TBMS-MCS0800 (1 pc)
Cavity
Spring
Click!
Battery Modules
TP-HR25 (4~13 pcs)*
TP-HR36 (4~13 pcs)*
TP-HS25 (4~13 pcs)*
TP-HS36 (4~13 pcs)*
Spring
5
T h e c a b l e m u s t
pass through here.

Advertenties

Inhoudsopgave
loading

Inhoudsopgave