EN
2. INSTALLATION
Instructions which must be followed by the drive and home automation professional installing the Glydea
Ultra motor.
Never drop, knock, drill or submerge the drive.
Install a separate control point for each drive.
2.1. INSTALLATION
2.1.1. Installation of the rail (Fig A)
1) Mark the position of the brackets.
2) Drill the ceiling or the wall at the right places.
3) Attach the brackets.
4) Attach the rail on the brackets.
2.2. WIRING
(Fig C)
Cables which pass through a metal wall must be protected and isolated using a sheath or sleeve.
Attach cables to prevent any contact with moving parts.
Leave the drive power supply cable accessible: it must be possible to replace it easily.
Switch off the power supply.
-
Connect the drive according to the information in the table below:
-
AC wiring
(Fig C1)
Wire
1
Neutral
2
Live
3
Earth
DCT wiring
(Fig C2)
1
CCW (Open) NO Dry contact
2
3
Ground Common
Drives equipped with a US power plug
Compatible controls - Wiring of control
1) Setting tool
2) Centralis IB
3) 2 NO (Normally Open) Dry contact switch
2.3. COMMISSIONING
DCT Setting tool
4
Copyright © 2017 SOMFY ACTIVITES SA, Société Anonyme. All rights reserved
2.1.2. Installation of the motor (Fig B)
1) Unlock the motor
2) Insert the motor sha into the drive pulley hole.
3) Lock the motor.
100V to 240V
Blue
Brown
Yellow / Green
4
5
Stop - NO Dry contact
6
CW (Close) NO Dry contact
(Fig C3)
(Fig D)
Open
Stop
Close
.