Download Inhoudsopgave Inhoud Print deze pagina

Resetting The Temperature Limiter; Reconnecting Sensors; Dealing With Malfunctions - Nibe ES Gebruikers- En Installatiehandleiding

Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

Installation of 6 kW immersion heater
Output selector (6 kW)
Set the water heater's output selector to the desired
output. Because the immersion heater receives the
lowest surface output at 3 kW, this position should be
used first. When a higher output is required, for example
during economy rates, set the output selector to 6 kW.
AV
3 kW
Setting thermostat
For the optimum operating conditions and to prevent
bacterial growth, we recommend a setting of 60 °C
(230V 1-phase and 400V 2-phase max approx. 75 °C and
400V 3-phase 6kW max approx. 85 °C).
Approx. 60 °C

DEALING WITH MALFUNCTIONS

NOTE
Electrical installation and service must be car-
ried out under the supervision of a qualified
electrician, and in accordance with applicable
electrical safety regulations.
Check the installation's fuses as well as the thermostat
and mixer valve settings.
NIBE ES | GB
6 kW
K
L E
K
L E
K
L E
L E
K
K
L E
K
L E

RESETTING THE TEMPERATURE LIMITER

If the temperature limiter (FQ10) tripped, the water
heater must cool for at least one hour before it can be
reset.
• Remove the plastic cover (QQ3).
• Give the button on the temperature limiter a light
press, max. 15 N (approx. 1,5 kg), applies in the event
of 2-phase installation, or max. 40 N (approx. 4 kg),
applies in the event of 3-phase installation.
FQ10
EB1
Tapping valve
Max 15 N (ca 1,5 kg)
K
L E
2-phase installation

RECONNECTING SENSORS

If the immersion heater has been replaced, the sensors
for the thermostat and temperature limiter must be re-
installed in the order shown in the image.
K
L E
K
L E
2-phase installation
K
L E
QQ3
Max 40 N (ca 4 kg)
LEK
STB
TR
3-phase installation
LEK
Temp. begr.
Termostat
STB
TR
LEK
3-fas installation)
3-phase installation
LEK
19

Advertenties

Inhoudsopgave
loading

Inhoudsopgave