LOFT 54F01003C
Step 4.2 : Use the assembled bed of step 4.1, the slatted frame P3, four nuts F and four bolts G
Place the slatted frame (P3) on the eye pins of the headboards. Push the nuts (F) through the eye pins and the drillings
at the bottom of the base. Push the bolts (G) through the holes on top of the bottom and tighten in the nuts.
Step 4.3 : Changing the slatted bed base position
Loosen the bolts (G) and remove the slatted frame. Move the eye pins (H) to another position at the same height and
repeat step 4.2.
Quax nv Karel Picquélaan 84 B-9800 Deinze Belgium T
T
0032 9 380 80 95
www.quax.eu - E
E
info@quax.eu
30