– To ensure that the feet continue to remain stable, all nuts
must be secured with a locknut.
Check measurements
The level of the installation system can be set from 67 to
205 mm. Measurements must be determined to allow
correct positioning.
Floor-level installation:
With floor-level installation, the dimensions of the universal
installation system extend 5 mm beyond the exterior
dimensions of the shower on all sides.
– X1: Distance from the unfinished floor level to the upper
edge of the finished floor (code „OKFF" is determined by
the setting-out points that exist at the customer's site)
= Thickness of insulation + screed + connection sealing
+ tile adhesive + floor tile
– X2: Base height
= Height of insulation + screed
– X3: Distance from tiling aid to the unfinished wall
= Thickness of wall tile + tile adhesive + connection
sealing
Tiled installation:
– X3: Distance from tiling aid to the unfinished wall
= Thickness of wall tile + tile adhesive + connection
sealing
– X4: Distance from the unfinished floor level to the upper
edge of the shower tray
Separate documents (e. g. for drain sets) should be
complied with.