Download Inhoudsopgave Inhoud Print deze pagina

Tap Installation; Keg Coupler Assembly - LINDR PYGMY 30/K profi Gebruikershandleiding

Droogkoelers
Inhoudsopgave

Advertenties

Beschikbare talen

Beschikbare talen

10. TAP INSTALLATION

1.
Turn the compensator lever (1.), so that it points down (see figure).
The compensator lever on the tap is used to adjust the flow rate.
2.
Fit the tap perpendicularly onto the spline.
3.
Secure with a flare nut and turn left. (loosen to the right).
4.
Tighten with the enclosed wrench.

11. KEG COUPLER ASSEMBLY

11.1 Outlet for Keg Pressurisation
Variant of connection with the use of a bushing; the hose is fitted onto the bushing and affixed
with a clip.
7 E
figure
7 A
figure
7 b
figure
7 C
figure
7 D
figure
7

Advertenties

Hoofdstukken

Inhoudsopgave
loading

Inhoudsopgave