EN
1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
The product you have purchased is intended only for the growing of plants
3.
take no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
SIte SelectIoN
Always try to select a sunny location, sheltered
from the wind as much as possible.
ImPoRtaNt
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
Nuts (1002) - max. tightening torque 3Nm.
Important! The UV-resistant side of the poly-
carbonate panes is indicated by a plastic folio
or printing at the edge. this side must face
outside. Remove the plastic folio.
NeceSSaRy toolS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, Accu-drill with adjustable torque.
maINteNaNce
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fixing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build up of
debris.
0. BaSe
Important! The base must be exactly square
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(attention! Only when the greenhouse has to
6
SICHERHEITSVORKEHRUNGEN
Safety Warning
Assembly Instructions
be located in a very windy and unprotected
location: Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specified in diagram 0. Treated
wooden beams at least 18 mm high and not
more then 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not pro-
vided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. SIDe elemeNtS
Lay all of the parts on the floor and connect
them loosely. (1.1) to (1.6)
Note: All bolt heads must slide into the bolt
channels in each vertical bar.
Note: The position of the corner bars (2230)
used should correspond to the front of the
house. The two sides will be a mirror image of
one another.
2. PlaIN gaBle eND
Lay the parts (2208), (2230), (2235), (2236),
(2291) and (2292) on the floor and connect
them loosely (2.2) (2.3) (2.8).
Slide panes A, B and C into the appropriate
guides in the vertical bars (2.4).
Please cut (K) to a length of 584mm so that
they fit between the aluminium profiles.
Position (2280) / (2281) on the relevant corner
bar (2230)
Connect (2244) / (2246) to the outside of roof
corner bar (2240) and (2245) / (2247) to the
and should only be used for this purpose. When used for other purposes we will
.
outside of (2241) (2.6)
.
Loosely connect corner plate (1043) to (2240)
and (2241) (2.5).
Connect the assembled roof corner bars over
the assembled panes (2.7) (2.9), taking care to
position (2280) and (2281) as shown
3. coNNectINg the SIDe elemeNtS
Insert 2 extra bolts into each roof corner bar
(2240) and (2241) (3.3) (3.4).
Insert an extra bolt in (2240)
[VM0017-T 2500:
or (2241) to later connect roof vent sill bar
(2260) on the desired side.
]
Bolt the side elements to the plain gable end
(3.1) (3.2).
Allow one of the extra bolts in (2240) and
(2241) to slide into the open hole in corner
angle (2215 / 2216) (3.4) (3.5).
Note: Position (2240) and (2241) using the
locating edge on (2215 / 2216).
Connect the front sill bar (2209) to corner bars
(2230) (3.6).
Connect back side brace (2293) (3.5) (3.7).
4. DooR gaBle eND
Assemble the front middle bars (2235) (2236)
and braces (2290) (2292) (4.3) (4.4) (4.5).
Slide panes A and C into the appropriate
guides in the vertical bars (4.2).
Please cut (K) to a length of 584mm so that
they fit between the aluminium profiles.
Position (2280) / (2281) on the relevant corner
bar (2230)
.
Connect (2244) / (2248) to the outside of roof
corner bar (2240) and (2245) / (2249) to the
outside of (2241) (4.6)
.
Insert 2 extra bolts into each roof corner bar
(2240) and (2241) (4.7) (4.8).
Connect the assembled roof corner bars over
the assembled panes, taking care to position
(2280) and (2281) as shown
Loosely connect corner plate (1043) to (2240)
and (2241) (4.7) and allow one of the extra
.
.
020.01.1704