Beliani NEIVA RL-1510 Montage-Instructies pagina 5

1500x1000x600 mm

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 63
Additionally, it is recommended to install 20 x 20 cm maintenance hatches for drainage/overflow,
ensuring proper noise insulation during installation.
For proper ventilation, the installation of a ventilation grill (not supplied) is absolutely necessary.
Depending on the bathtub model, position the ventilation grill in the wall lining near the units.
Inside the hatch, a ventilation grid (minimum 150 cm) can be fitted to supply air to the blower.
Alternatively, consider placing a maintenance hatch/ventilation grid in the adjacent room.
To optimise sound insulation, install the ventilation grid with soundproofing materials. It is also
acceptable to place the ventilation grid in the adjacent room, if suitable.
When space is
limited: If there is insufficient room for a maintenance hatch, "surface mounting"
is recommended to allow for the complete disassembly of the bathtub when necessary. Ensure
that the drainage pipe, electrical connections, and, if applicable, the water supply line can be
disconnected through the ventilation opening. Seal the entire perimeter of the bathtub rim with
silicone (acetic acid-free).
Checking for leakage
After connecting the water inlet and drain of the bathtub, it must be filled and checked for leaks.
Check the following functions using the control panel:
A. Air system
B. Water pump settings
Bathtub water temperature should not exceed 40 °C.
5