Download Inhoudsopgave Inhoud Print deze pagina

Siemens LC 901 Series Montagevoorschrift En Gebruiksaanwijzing pagina 27

Inhoudsopgave

Advertenties

Beschikbare talen
  • NL

Beschikbare talen

  • DUTCH, pagina 42
Installation
This extractor hood is intended to be
mounted either directly onto the kitchen
ceiling or onto a stable, suspended ceiling
structure.
See Technical Data for weight of the
extractor hood.
Ensure that the minimum distance
between the hob and the extractor hood is
maintained – 550 mm for an electric hob and
650 mm for a gas hob.
1. Mark the centre of the position on the cei-
ling at which the hood will be mounted.
2. Use the template to mark the position of
the holes for the mounting screws.
3. Drill 4 x l 8 mm holes and insert plugs
into the holes so that they are flush with
the ceiling.
4. Assemble the support frame (8 screws).
The overall length of the support frame
for the standard chimney panelling
enclosed with the hood is 565 mm. In the
case of longer cover panels, the length of
the support frame can be adjusted in steps
of 20 mm (from at least 425 mm up to max.
of 725 mm for the exhaust-air version and
from at least 505 mm up to max. of 725 mm
for the recirculating version).
5. Mount the support frame onto the ceiling.
The support frame is marked with
"FRONT" on one side. This is side
where the switches for the extractor
hood will be after installation has
been completed.
6. Screw two hex bolts from underneath all
the way into the threaded holes in the
extractor hood.
Screw nuts onto the bolts, leaving a gap
of approx. 4 mm.
7. Lift up the extractor hood and hook the
protruding nuts into the key-hole slots
and secure the hood in place with 2 hex
bolts inserted from above into the holes
at the corners on the opposite side.
565
27

Advertenties

Inhoudsopgave
loading

Deze handleiding is ook geschikt voor:

Lc 911 seriesLc 9x1 series

Inhoudsopgave