4. COMMISSIONING, TRANSPORTING, STORAGE
AND REASSEMBLING
a. Commissioning – Tiller assembling
After receiving our new hand pallet truck you may have to do following before firstly operating the truck:
• Check if are all parts included and not damaged.
• Do the work according to the daily inspections as well as functional checks.
• Eventually assemble the truck according to following instructions.
The commissioning weight is approximately 10 kg / six-pack higher than the product weight.
Before assembling, please make sure, that the following supplied parts are included and not damaged:
• 1 pc axle with hole (4).
• 2 pc dowel pin (5) [one is already assembled with the axle].
• 1 pc pre- assembled tiller arm (1).
• 1 pc pre- assembled chassis with pump unit (6).
1
Tillerarm
2
Pin
3
Nut
0519_Manual PalletTruck1_A5.indd 9
0519_Manual PalletTruck1_A5.indd 9
4
Axle with hole
5
Dowel pin
6
Chassis with pump unit
www.kramp.com
www.kramp.com
Figure 5: Tiller Assembling
13/06/2023 10:29
13/06/2023 10:29
9
GB