EN
Safety warning!
For the illustration, see page 122.
2. INSTALLATION
Instructions which must be followed by the drive and home automation professional installing the Movelite
motor.
Never drop, knock, drill or submerge the drive.
Install a separate control point for each drive.
2.1. INSTALLATION
2.1.1. Installation of the rail (Fig A)
1) Mark the position of the brackets.
2) Drill the ceiling or the wall at the right places.
3) Attach the brackets.
4) Attach the rail on the brackets.
2.2. WIRING
(Fig C)
Cables which pass through a metal wall must be protected and isolated using a sheath or sleeve.
Attach cables to prevent any contact with moving parts.
Leave the drive power supply cable accessible: it must be possible to replace it easily.
Switch off the power supply.
-
Connect the drive according to the information in the table below:
-
AC wiring
(Fig C1)
Wire
1
Neutral
2
Live
3
Earth
DCT wiring
(Fig C2)
1
CCW (Open) NO Dry contact
2
3
Ground Common
Compatible controls - Wiring of control (Fig D)
1) Setting tool
2) Centralis IB
3) 2 NO (Normally Open) Dry contact switch
2.3. COMMISSIONING
DCT Setting tool
2.3.1. Pre-programming the RTS control point (only for RTS version) (Fig E)
1)Switch on the power supply
2) Press the Open and Close buttons on the RTS control point at the same time: The motorised product moves up and
down, and the RTS control point is pre-programmed in the motor.
Caution!
2.1.2. Installation of the motor (Fig B)
1) Unlock the motor
2) Insert the motor sha into the drive pulley hole.
3) Lock the motor.
100V to 240V
Blue
Brown
Yellow / Green
4
5
Stop - NO Dry contact
6
CW (Close) NO Dry contact
RTS control point
Open
my/Stop
Close
Copyright © 2018 SOMFY ACTIVITÉS SA, Société Anonyme. All rights reserved
Information
TM
.