p. 2/2
Instructions TJERK cabinet
2x
1x
1x
1.
Make sure the base is level by
turning the four adjustable feet.
That way you can be sure that
the doors will not hang askew.
4.
When placing two elements
on each other make sure the
top element fals into the
lower element.
7.
Place the shelfs with the
front beam in the middle of
the cupboards.
1x
2.
Place the cupboard on the
baseboard.
5.
Bolt the two cupboards onto
each other with the delivered
screws.
8.
Hang the left and right doors
into the hinges of the lower
cupboard.
4x
1x
1x
3.
Bolt the cupboard on the base-
board with the delivered bolts.
6.
Place top-, and bottom
shelves in the cupboard.
9.
Hang the left and right doors
into the hinges of the upper
cupboard.