Operation Logic
PV Supply priority :
Loads → Battery → Export
Solar power of the system will support loads
first then charge battery, and the exceed
power will be able to export to grid which
could be limited.
• There is no priority supply to back-up
power and on-grid power.
• The logic is based on the proper
installation and normal communication
of Smart Meter + CT
PV
Distribution Box
RS485
Hybrid
Inverter
Back-Up Wiring
BMS Cable
On-Grid Wiring
Lithium Battery
Utility
Smart Meter
Back-Up Loads
On-Grid Loads
11