PQ
Performance Qualification
Organisation:
Model:
The PQ consists of inspections of
the correct operation of the cabinet
under predefined conditions and
procedures. Prerequisites for the
PQ are IQ (Installation Qualification)
and OQ (Operation Qualification),
these must be concluded
successfully prior to the initiation of
the PQ.
64
Location of installation:
SN:
Person responsible for the cabinet:
Name:
________________________________________________
Date:
________________________________________________
Signature: ________________________________________________
Person responsible for test:
Name:
________________________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Person responsible for verification of test:
Name:
________________________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Test duration:
Initation (date/time): ______________________________________
Conclusion (date/time): ___________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Model: ________________________
Item number:
(manual)
SN: ________________________