Installation module for MS Greenline Move valve .
First of all read the MS Greenline manual. The
product in the image to the side is the end
result.
Make sure that there are NO orifices in both
suction openings (see yellow and blue arrow).
If you use the MS Greenline Move ascending
needle.
Then mount the valve onto the trolley.
Four M6x35 screws, rings and bolts are supplied
with the trolley.
Next, connect the high pressure sprayer and the lance according to the Greenline
manual
NB: if you have the option of a hose reel, then follow first the instruction on page 9.
21