PQ
Performance Qualification
Organisation:
Model: ________________________
The PQ consists of inspections of
the correct operation of the cabinet
under predefined conditions and
procedures.
Prerequisites for the PQ are IQ
(Installation Qualification) and OQ
(Operation Qualification), these
must be concluded successfully
prior to the initiation of the PQ.
100
Location of installation:
SN: ________________________
Person responsible for the cabinet:
Name:
________________________________________________
Date:
________________________________________________
Signature: ________________________________________________
Person responsible for the test:
Name:
________________________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Person responsible for the verification of the test:
Name:
________________________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Test duration:
Initation (date/time): ______________________________________
Conclusion (date/time): ___________________________________
Date:
________________________________________________
Organisation: _____________________________________________
Signature: ________________________________________________
Model: ________________________
Item number: ________________________
(manual)
SN: ________________________