Download Print deze pagina

Gram BioMidi 425 Gebruiksaanwijzing pagina 149

Verberg thumbnails Zie ook voor BioMidi 425:

Advertenties

Deviations from the specifications dictated in the PQ, are to be reported in the deviation report.
The PQ is concluded if all criteria of acceptance are approved and the possible deviations are rectified or accepted.
Measurements – Prerequisites
ID
Description
P-4
Measurements made during the PQ tests must be documented and
attached to the PQ.
Attachment:
Notes:
P-5
Specify setpoint temperature:
Specify the ambient temperature:
Attachment:
Notes:
P-6
Allowed tolerances –
Select the tolerance, according to the model being tested.
Find model-specific tolerances in appendix.
Tolerance: +/-
Attachment:
Notes:
Name:
Conducted by:
Inspected/verified by:
°C
°C
K
Signature:
Model: ________________________
b i o l i n e
Accepted
Yes
Approved
Date:
(Yes/No):
SN: ________________________
No
149

Advertenties

loading